ScopeSense

Guides

The EU rules that reach into electrical scope.

A dated calendar, a working CPR checklist and a map of which rule touches which part of an electrical package. Plain-language guides follow for each one, starting with the CPR and DIN VDE 0100.

Find a rule, topic or scope area

Filters the calendar, the guides and the standards map on this page.

Try

Type to filter. Clear the box to see everything.

Regulatory calendar

Which dates have passed, and which apply to your next tender.

The fixed EU dates behind our guides, on one timeline. Standards apply per tender and have no single deadline.

Jul 2025 to Jun 2027
EU dateVia national law or per tenderToday
  1. New CPR appliesDeclarations of Performance under (EU) 2024/3110, phased in by product family. The 2011 rules run alongside until 2040. Verify against the official text.
  2. EPBD transposition deadlineMember states apply the directive through national law. Verify against the official text.
  3. DPP registry openedCommission registry opened 20 Jul 2026. Passports become mandatory product group by product group, starting with batteries in Feb 2027. Verify against the official text.
  4. Per tender
    DIN VDE 0100, 0108-100, ISO 19650Apply as the tender and national rules require.

Dates summarise the official texts. Verify against the official text and the edition your tender cites. Not legal advice.

CPR (EU) 2024/3110
EU regulation for construction products. Applies since 8 Jan 2026; Declarations of Performance with verifiable data, phased in by product family.
EPBD (EU) 2024/1275
Energy performance of buildings, applied through national law.
Digital Product Passport
Machine-readable product data linked to a central EU registry. Mandatory product group by product group.
DIN VDE 0100 · ISO 19650
Installation rules and BIM information management, as the tender requires.

Start with the CPR

Run five checks before a bid goes out.

The rule with the earliest date on the calendar. Use the checklist here; the full guide explains each step.

Instrument
Construction Products Regulation (EU) 2024/3110
Applies from
8 January 2026Verify against the official text.
Bid-time impact
Declarations of Performance carry richer, verifiable data, starting with GWP, as each product family moves to the new rules.
Scope areas
Cables and containment · Product data and declarations
  1. What changed in 2026
  2. Who is on the hook
  3. The GWP declaration
  4. Where the Digital Product Passport fits
  5. Contractor checklist for bids
  6. Where ScopeSense helps
Read the full CPR guide →

Before you send a bid

Tick them off here. Nothing is saved or sent.

Checklist
0 of 5 done

Guide library

Plain-language guides, one per rule.

Written for estimators and project managers, not lawyers. Published guides open in full; for the rest, the outline shows what each will cover.

7 guides

Standards map

Which rule reaches which part of your scope?

Six regulations and standards against eight scope areas of an electrical package. Select a row to see what it asks of your bid.

CPR(EU) 2024/3110
Cables and containment
Product data and declarations
Carbon and GWP
Digital Product PassportEU registry
Cables and containment
Switchgear and distribution
Product data and declarations
Carbon and GWP
BIM and as-built info
EPBD(EU) 2024/1275
EV and PV readiness
Carbon and GWP
DIN VDE 0100IEC 60364 in Germany
Cables and containment
Switchgear and distribution
Earthing, bonding, SPD
Safety lighting
EV and PV readiness
DIN VDE 0108-100Safety lighting
Cables and containment
Safety lighting
ISO 19650BIM, parts 1 and 2
Product data and declarations
BIM and as-built info
Primary effectRelatedCoverage reflects our guides, not the full legal scope.

In a real tender

The same rules, checked against your documents.

ScopeSense reads the tender, extracts the items and checks them against DIN VDE, IEC and EU rules. What is required but not covered becomes a flagged gap or an RFI.

  • 01Requirement foundEach clause is tied to the page or drawing it came from.
  • 02Matched to scopeChecked against the items extracted from the package.
  • 03Gap or questionUncovered or unclear items go into the RFI report.
Mixed-use building · electrical packageRule check · 5 findings shown
Sample project
Cable DoPs to be submitted with the bidSpecification§3.2 · p. 14CPRCovered
Surge protection at main distributionDrawing E-101note 4DIN VDE 0100-534No item
Emergency escape lightingGeneral conditions§7.3DIN VDE 0108-100No item
Product data for as-built handoverInformation requirements§5ISO 19650RFI
EV charging readiness, car parkArchitect's briefp. 3EPBDNational rule
RFI-03 · draftFrom: Emergency escape lighting

Please confirm whether emergency escape lighting to DIN VDE 0108-100, referenced in General conditions §7.3, is part of the electrical package. No corresponding item was found in the drawings or specification. Sample text. Every RFI is editable before export.

How to use these guides

A starting point, not the final word.

General information, not legal advice

Guides summarise EU rules for estimating work. The official text and your tender documents take precedence.

Dated and versioned

Every guide shows when it was last updated. When a rule changes, the guide is revised and re-dated.

Check the edition cited

Standards exist in several editions. Price against the one your tender names, and raise an RFI when it names none.

ScopeSense

Check your next tender against these rules.

Free plan: 14 days, 300 credits, no card.

  • Flags CPR, DPP and DIN VDE requirements buried in specifications
  • Cross-checks them against the items extracted from your project
  • Turns gaps into an RFI report; project chat on every plan
  • Hosted in the EU (netcup, Vienna); processing locations listed in the DPA